Expansion of the Lattakia Harbour 1980 - 1983
Lattakia Port Authortity
1- Underwater Dredging 700,000
cubic meter, 35% of solid rock
2- Quays 2200 m at depths ranging from 6.30 m - 13.30 m
3- Concerte Works 150,000 cubic meter
4- Back Filling 200,000
Dredging Operations and Layering for the Underwater Foundations
Stages in the finishing of the Super Structure
Dredging using the Marcopolo Dredger (16,000 b.h.p.)
Quay Construction using a 130 m.t.
Secondary Breakwater Construction
Finished Super Structure of Lattakia Harbour.
Expansion of the Lattakia Harbour.
Quay Construction using Concrete Blocks (100 m.t.)