RETURN TO PROJECTS TIME LINE
RETURN TO SERVICES

Dredging the Basin of Houssein El Baher Petroleum Port 1988-1989.
Syrian Company for the Transport of Petroleum.
Undewater Dredging 50000 Cubic Meters
Rock Installation 5000 Tons
Concrete Blocks 2000Tons.
Mainetence Works at the houssein Al-Baher Petroleum Port.
TOP